User Tools

Site Tools


department_setups

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
department_setups [2013/11/14 09:12 (11 years ago)] cliffdepartment_setups [2013/12/05 13:56 (11 years ago)] (current) mark
Line 17: Line 17:
 Tip(cm): The routines should be ran on the data server if possible to help the routine Tip(cm): The routines should be ran on the data server if possible to help the routine
 run as quickly as possible. It can easy take 10 times as long to perform the restart run as quickly as possible. It can easy take 10 times as long to perform the restart
-from a client PC, not on the server. +from a client PC, but should not take as long from the server. 
 </code> </code>
  
Line 81: Line 81:
 First thing to be considered is in the real world, is my shop closing or are two shops being merged together.  First thing to be considered is in the real world, is my shop closing or are two shops being merged together. 
  
-If my shop is closoing I may wish that all transactions from that shop end up in the head office. This would mean moving department four to department one.+If my shop is closing I may wish that all transactions from that shop end up in the head office. This would mean moving department four to department one.
  
 If I have two shops that are merging I may wish to move all the transaction from one into the other. This would mean moving department four to department three. If I have two shops that are merging I may wish to move all the transaction from one into the other. This would mean moving department four to department three.
department_setups.txt · Last modified: 2013/12/05 13:56 (11 years ago) by mark